欧美成年性色生活片 毛片

  • <th id="6ju7q"><sup id="6ju7q"><wbr id="6ju7q"></wbr></sup></th>
  • <strike id="6ju7q"></strike>
    <strike id="6ju7q"><sup id="6ju7q"></sup></strike>

  • <center id="6ju7q"><em id="6ju7q"><track id="6ju7q"></track></em></center>

  • <tr id="6ju7q"></tr>

    Technical Force
    Equipment Capacity
    Quality System
    Talents Reserves
     
       Mould
       Advanced software and hardware. Available for conversion of different format files. We design and analysis with UG, Pro-E, CAD, Moldflow. Sunny is experienced on 2K and air assistance moulding. German expert is participating the project on site. Sunny is project oriented, and at the same time, every process of the project will be strictly controlled under ERP system, these assure the quality and timing.
     
       Till now, Sunny has gained several patent on mould design.
     
       To promote our core competitiveness, cooperated with Shanghai Jiaotong University, National Mould CAD Engineering Center, we established united technology R&D center. R&D center is composed with tooling designers, project management, CAD/CAM/CAE experts, development & application engineers, and technicians. The main objects are for injection moulding, such as air assistance moulding, 2K, multi-shots, water assistance, high gloss, high precision and automatic moulding. With OEM synchronzied R&D capability, center is also devotes in developing int & ext decoration parts for medium and luxury vehicles. Other researchs on more complicated and high requirement injection moulds, are still working on: non-painting, IMD and In-mould asssembly.
     
    Part Injection
     
        In 2006, Sunny established R&D center, devoted in developing and designing of medium size plastic part, especially for air venting. R&D center has two teams: part design and project management.
     
       Designers in center are experienced in designing of air ventings. They have strong comprehensive capacity on air ventings: performance, structrure, material, testing, fixture, movement simulation analysis.
     
       Project engineers have excellent knowledge on project management and development. The project processes are controlled under TS16949.
     
       At the same time, Sunny is always promoting the testing equipments. Current testing equipments for air venting can meet most requirements from different customers.
     
       Successful projects: BAW-Mercedes-Chrysler J1, BAW-Mercedes H06A, FAW-Jason Control Mazda 6, BAW-Foton H3&H4, SM LDV, SM BP31, SM ZP11, Cherry A13, and Cherry L41 etc.

     

    Home  |  About Us  |  Products  |  Technical  |  News  |  H & R  |  Contact Us
    Copyright © 2010 NINGBO SUNNY MOULD CO.,LTD. Add:#518 JinShun East Road, Yuyao, Zhejiang, China
    Management Mail Login
    欧美成年性色生活片 毛片
  • <th id="6ju7q"><sup id="6ju7q"><wbr id="6ju7q"></wbr></sup></th>
  • <strike id="6ju7q"></strike>
    <strike id="6ju7q"><sup id="6ju7q"></sup></strike>

  • <center id="6ju7q"><em id="6ju7q"><track id="6ju7q"></track></em></center>

  • <tr id="6ju7q"></tr>